Abstract:
Report includes references to field books used plus Text, tables,maps technical drawings, spreadsheets regarding this project which primary aims: 1. " of the 1984-85 summer surveying program was to continue with the establishment of the vertical control network on Long, Broad and Mule Peninsulars which would enable periodic and accurate monitoring of water level fluctuations of specified fresh and
... saline lakes in the Vestfol Hills". ALSO report on Davis Magnetic and gravity stations and Dept of Housing and Construction site surveys and also assistance with RAN Miniranger sites, Davis. 2. Primary aims for 1985-86 season were "complete loop closures of vertical control networks on Long, Broad and Mule Peninsulars and ALSO to co-ordinate Dr Gallagher's long/cross section origin points along the length of Ellis Fjord." Includes colour photographic prints.