AM02 borehole drilled December 2000.
Several caliper profiles obtained as a &first look& at borehole closure rates.
Consult Readme file for detail of data files and formats.
AM01 borehole drilled January 2002.
Profiling measurements conducted to test borehole diameter integrity.
AM01b borehole drilled mid-December 2003.
No new caliper data collected due to faulty wiring ...